Beech Ward subsidence remedial works

The existing timber retaining walls had become unstable and were suffering with rot leading to bank erosion. The soil was therefore subsiding in areas becoming both unsightly and unsafe as the perimeter palisade fence had also become affected by the subsidence of the bank.

A concrete retaining wall by ‘Team Elite’ was selected and the concrete panels specified blended in with the area with a wood effect design.

Photos show pre works, during works and finally post works.

The main contractor ASHE Construction were appointed via the NHS SBS Framework and completed all works in 3 x weeks and the end result has been very well received.

NHS Trust
www.hpft.nhs.uk

£150k