Beech Ward subsidence remedial works

Beech Ward subsidence remedial works

The existing timber retaining walls had become unstable and were suffering with rot leading to bank erosion. The soil was therefore subsiding in areas becoming both unsightly and unsafe as the perimeter palisade fence had also become affected by the subsidence of the bank.

A concrete retaining wall by ‘Team Elite’ was selected and the concrete panels specified blended in with the area with a wood effect design.

Photos show pre works, during works and finally post works.

The main contractor ASHE Construction were appointed via the NHS SBS Framework and completed all works in 3 x weeks and the end result has been very well received.

hpft.nhs.uk

NHS Trust

Value: £150k

Blu Building Consultants Beech Ward subsidence remedial works

If you have an immediate need for expertise in the healthcare, education or commercial sector or would simply like to discuss a future project, we’d welcome an opportunity to meet up.

Call us on +44 1582 240 340